Playbook · Pilot readiness

What to validate before a paid pilot

Camera angles, lighting, network, privacy, acceptance criteria and the evidence needed for a go / no-go.

WyseTime Technologies · 4 September 2026 · 7 min read · Written from Capability Manifest & Claim Matrix v1.1

Illustrative retail floor camera view with a service-counter zone and a queue zone outlined
Illustrative: before a pilot, each candidate camera is checked for whether the condition — here an attended counter and a queue zone — is actually visible and judgeable. Overlays are drawn for explanation.

Why the study comes before the pilot

Most disappointing AI-camera projects fail before the software is switched on: the camera could not see the condition, the lighting changed at night, nobody owned the response, or the “accuracy” was a number nobody could reproduce on site. A paid Site & Scenario Readiness Study exists to find those failures on paper, for a fraction of a pilot’s cost, and to end with a written go / no-go that belongs to you.

Whether the scenario is a warehouse dock, a mall service counter or a factory station, the same ten items decide readiness.

The ten-point site-readiness check

Score each item 0 (missing), 1 (partial) or 2 (confirmed). This is the same scoring used inside the study.

  1. Visible problem. The condition you care about is actually visible from an existing camera angle, and it occupies enough pixels and time to judge.
  2. Suitable cameras. Resolution, field of view, lighting across the shift, occlusion and retention are known for each candidate camera.
  3. Stream and network access. RTSP/IP streams are reachable, the network segmentation is understood, and someone has authority to configure it.
  4. Named workflow owner. A specific person receives the exception and closes the loop — including at 9 p.m. on a Sunday for a retail portfolio.
  5. Economic buyer. The person who funds a production rollout is identified and reachable.
  6. Measurable baseline. Today’s manual check is described: who does it, how often, what a miss costs. Without a baseline there is nothing to measure the pilot against.
  7. Privacy path. Model A (media stays on site) or Model B (approved frames leave under documented approval) is chosen per site, and biometric processing is out of scope.
  8. Support fit. Service hours and escalation are agreed in writing rather than assumed.
  9. Paid-pilot budget. The organisation can fund a bounded pilot and a production path if the pilot passes.
  10. Expansion potential. There is a second site or a second scenario worth reaching if the first proves out.

16–20: propose the paid study and pilot. 11–15: close the gaps first. 0–10: defer — a pilot now would consume goodwill without producing evidence.

Illustrative strip of retail, industrial, loading-bay and warehouse camera contexts
The same ten-point check applies across retail, industrial, loading-bay and warehouse contexts — only the scenario vocabulary changes.

Acceptance criteria are written before the pilot starts

A pilot is accepted against criteria agreed in advance and signed by a named owner on the customer’s side. The seven categories:

CategoryWhat gets written down
Scenario definitionScenario name, camera views, the operational question, the rule in plain language.
Ground truthHow many labelled test cases, who labels them, and the video window used.
Performance measuresPrecision, recall, false-alert count and miss count at the agreed threshold.
Operational measureShare of exceptions acknowledged within the agreed window; reports delivered on schedule.
Capacity measureThroughput against the sizing estimate; latency measured end to end for your scenario and network.
Business measureBaseline versus pilot: hours saved, missed checks reduced, incident evidence produced.
Acceptance decisionPass, fail-with-remediation, or no-go — signed by a named owner.
Accuracy is measured during your pilot against agreed test cases. That number is real, and it is yours — which is exactly why it is not quoted in advance.
Illustrative footage search that retrieves earlier moments matching a plain-language query Illustrative live alert panel showing an exception with its evidence frame
Ground truth and performance measures need retrievable evidence: labelled test cases on the left, live exceptions with attached frames on the right. Both panels are illustrative.

Three scenario examples

  • Warehouse dock monitoring. Rule: “bay 3 attended within 10 minutes of a trailer docking”. Validate: the dock camera sees both the trailer and the bay floor; night lighting; who at the 3PL closes the exception.
  • Mall operations. Rule: “information counter attended during opening hours”. Validate: counter is visible without occlusion from signage; the regional operations lead receives the weekly branch comparison.
  • Factory station. Rule: “station 4 attended during operating hours”. Validate: angle shows the operator position; shift schedule loaded; production supervisor owns the exception.

What a good go / no-go contains

Camera census with suitability notes per camera; N/L/A sizing (recorded, live, continuous-AI counts); the workflow baseline; the privacy map with the Model A/B recommendation; the draft acceptance criteria; and an investment estimate. If the verdict is no-go, you keep the conclusions — that is what the study fee buys.

Bring one site to a 30-minute clinic

We run the first pass of this checklist with you live and send a Readiness Study proposal within 48 hours.